Come on in...the building's fine!
The siding and windows are being installed. You can actually come inside and feel the size and envision the classrooms, gym, bathrooms (yea ladies!) and auditorium. The site work engineer has grated and leveled the road leading to our Education wing. The carport will be a blessing to our Mom’s with small children as they can drop them off and stay dry. Things are moving. We pray they will continue with no major set-backs. |